Sand & Aggregate Calculator

Calculate the exact quantity of sand, aggregate and cement bags needed for mortar, plastering, floor screeding and brickwork. Supports multiple mix ratios with dry-volume correction.

Mortar, Plaster & Screed Dry Volume Corrected
Plastering Details
Wet Volume
Dry Volume (× 1.54)
Cement Bags (50 kg)
Cement Volume
Sand Volume
Sand Weight
Floor Screed Details
Floor Area
Wet Volume
Dry Volume (× 1.54)
Cement Bags (50 kg)
Cement Volume
Sand Volume
Sand Weight
Screed thickness of 40 mm is standard for domestic floors. Ensure subbase is clean, sound and properly prepared before laying.
Brickwork Mortar Details
Wall Volume
Mortar Volume (10% of wall)
Dry Volume (× 1.54)
Cement Bags (50 kg)
Cement Volume
Sand Volume
Sand Weight
Mortar is assumed to be 10% of total wall volume (brick + mortar). Actual proportion may vary by brick size and joint thickness (typically 10–12 mm joints).
Plain Cement Concrete (PCC) Details
Area
Wet Volume
Dry Volume (× 1.54)
Cement Bags (50 kg)
Cement Volume
Sand Volume
Sand Weight
Aggregate Volume
Aggregate Weight
M15 (1:2:4) is the minimum grade recommended for PCC under footings and foundations. M10 (1:3:6) is used only for lean concrete bed or blinding layers.

Dry Volume Correction Factor Explained

When cement and sand are mixed dry, the total volume appears larger than the final wet (mixed with water) volume. This is because water fills the voids between particles, causing the mix to compact. The dry volume factor of 1.54 means that to produce 1 m³ of wet mortar you need to start with 1.54 m³ of dry materials.

  • Wet volume = area × thickness (m)
  • Wet volume with wastage = wet volume × (1 + wastage / 100)
  • Dry volume = wet volume × 1.54 (mortar) or × 1.54 (concrete)

For a 1:N mortar mix: total parts = 1 + N. Cement volume = dry volume × 1/(1+N). Sand volume = dry volume × N/(1+N).

Mortar Mix Ratios for Different Applications

ApplicationRecommended MixNotes
Internal wall plaster1 : 6General internal walls, gives smooth finish
External wall plaster1 : 4Weather-exposed surfaces, stronger mix needed
Ceiling plaster1 : 3Richer mix for overhead work, less sagging
Floor screed1 : 4Standard domestic screed, 40–50 mm thick
Brickwork mortar1 : 5 to 1 : 6Load-bearing walls use 1:5, partition walls 1:6
PCC (M10)1 : 3 : 6Lean concrete, blinding layer below footings
PCC (M15)1 : 2 : 4Minimum structural PCC, under RCC footings

FAQ

The dry volume factor for mortar is 1.54. This means the dry mix volume is approximately 54% more than the wet volume of mortar. This accounts for voids between sand particles and cement that are filled when water is added. For concrete, the factor is also 1.54 (some references use 1.57).
For floor screed, a 1:4 (cement:sand) mix ratio is most commonly recommended. For lightly loaded areas, a 1:5 mix can be used. For heavy-duty floors, a richer 1:3 mix may be specified. Screed thickness typically ranges from 25 mm to 65 mm depending on the type (bonded, unbonded or floating).
For 100 m² of internal plastering at 12 mm thickness with a 1:6 mix and 20% wastage: wet volume = 1.2 m³; with wastage = 1.44 m³; dry volume = 1.44 × 1.54 ≈ 2.22 m³; sand = 2.22 × (6/7) ≈ 1.90 m³ ≈ 3.04 tonnes. Approximately 9–10 bags of cement (50 kg) and 3–3.5 tonnes of sand are needed.
Mortar is a mixture of cement, sand and water used to bind bricks or for plastering and screeding — it contains no coarse aggregate. Concrete is a mixture of cement, sand, coarse aggregate (gravel) and water, used for structural elements like slabs, beams and columns. Concrete is significantly stronger and is used wherever structural load-bearing capacity is required.